800.968.1236

Corbin Design Directs Glass Pavilion Visitors

Posted in Education, Uncategorized, Wayfinding Concept on January 4th, 2011 by Mark VanderKlipp – Be the first to comment
Artdaily.org article

Artdaily.org article

This article was recently posted on ArtDaily.org and picked up by a variety of related news sources. It pertains to the value of the wayfinding system we’re developing for the Glass Pavilion at the Toledo Museum of Art. Since we are still in preliminary planning and design stages, we have not posted any images of the project. Suffice it to say that we are honored to be associated with this institution, and are working diligently to both pay tribute to the spectacular architecture and assist everyday visitors in finding their way.

Link to the full article here.

Post to Twitter Post to Digg Post to Facebook Post to StumbleUpon

Corbin Design, a national leader in wayfinding planning and signage design, announced Shelley Steele has been named President. Steele formerly served as vice president of marketing.

As president, Steele is primarily responsible for the vision and direction of Corbin Design as well as the internal leadership and management of the staff. In her new role, she will continue to oversee business development and marketing.

“With her knowledge of the… More...

As we develop wayfinding systems for a variety of clients, we appreciate how public engagement is critical to the design process. Here, we share two examples from recent client groups and the outcomes of those sessions:

Ochsner Medical Center, New Orleans LA

We led a prototype process on the interior of this complex medical campus to test proposed logic changes and as a “proof of concept” for wayfinding tools. The exercise was designed to… More...

The FHWA has issued a clarification on the ruling it issued on January 25, 2016 terminating the Interim Approval of Clearview as an alternate font to the MUTCD. With regard to community wayfinding signage systems, the use of alternate fonts is still possible.

To summarize:

  • Projects currently in fabrication do not need to comply.
  • To the extent possible, projects currently in design should switch to the

Leave a Reply